Corporate Resume

Pg. 2

 

Brackish Water System Upgrades

Wolf Lake, Alberta
November 2011 - November 2012
Project Value (Time & Materials): $9.5 M

This “brown field” project included system upgrades to an existing operating facility. Our scope of work included procurement of all materials for structural steel and spool fabrication, shop fabrication of all spools (approximately 18,000 dia. inches) and pipe racks, skids and platforms, installation of all spools, pipe racks and platforms. We were responsible for the coordination of all other trades for this project including supply of all cranes, supply and installation of all insulation (third party), installation of all scaffolding (third party), internal coating of spools (third party) and ensuing all spool internals were properly prepared for coatings, commissioning and start up assistance.

Centrifuge Installation

Wolf Lake, Alberta

March 2012 - October 2012
Project Value (Time & Materials): $4.3 M 
This “brown field” project included adding a Centrifuge Unit to an existing facility. Our scope of work included procurement of all materials for structural steel and spool fabrication, shop fabrication of all spools (approximately 9,000 dia. inches) and pipe racks, skids and platforms, installation of all spools, pipe racks and platforms.

20 Wedge Well SAGD Production Pad

Foster Creek, Alberta

April 2012 - October 2012

Project Value (Time & Materials): $1.8 M 

This was a “brown field” project to install wellhead piping and well pump skids onto an existing SAGD production pad. Our scope of work included procurement of all materials for structural steel and spool fabrication, shop fabrication of all spools (approximately 4,500 dia. inches) and pipe racks, skids and platforms, installation of all spools, pipe racks and platforms. 

16-Well SAGD Production Pad

Christina Lake, Alberta

December 2011 - May 2012

Project Value (Lump Sum): $3.5 M 

This was a “green field” project to construct a new 16-well SAGD production pad. Our scope of work included procurement of all materials for structural steel and spool fabrication, shop fabrication of all spools (approximately 16,000 dia. inches) and pipe racks, skids and platforms, installation of all spools, pipe racks and platforms.

14-Well SAGD Production Pad

Foster Creek, Alberta
July 2011 - November 2011

Project Value (Lump Sum): $2 M 

This was a “green field” project to construct a new 14-well SAGD production pad. Our scope of work included procurement of all materials for structural steel and spool fabrication, shop fabrication of all spools (approximately 8,000 dia. inches) and pipe racks, skids and platforms, installation of all spools, pipe racks and platforms. 

Pad Group Separator Installation

Christina Lake, Alberta
June 2011 - November 2011

Project Value (Lump Sum): $1.1 M 

This was a “brown field” project which included installation of an owner supplied group separator skids onto 4 existing SAGD pads. Our scope of work included procurement of all materials for structural steel and spool fabrication, shop fabrication of all spools (approximately 5,200 dia. inches) and pipe racks and platforms, installation of all spools, pipe racks and platforms. 

Facility Expansion Pile Cutting & Capping

Foster Creek, Alberta

February 2011 - May 2011

Project Value (Unit Price): $500 K 

This was a “green field” project for a existing facility expansion. Our scope of work included the supply of labour and equipment to cut and cap owner supplied steel piles.

 

Back to Corporate Resume

 

 

 

Facility Construction and Other Oilfield Services.

You can trust our 40 years of service in the Alberta oil and gas industry. We have done many facility construction projects and have countless satisfied customers all across Alberta.

Box 8075
Bonnyville, Alberta T9N 2J3
Ph (780) 826-3847
Fx (780) 826-1920

Copyright © 2014 The Bonnyville Welding.
All Rights Reserved. Designed by Mediashaker,
built using ShoutCMS.

Services

  • Facility Construction
  • Pipe Fabrication
  • Quality Control
  • Welding
  • Steel Fabrication
  • Barrel Docks

Certifications

  • ABSA
  • Certificate of Recognition
  • CWB

Connect